Jersey Shore Rebuilds 2013 Part 1: Sandy and the Jersey Shore

Jersey Shore Rebuilds 2013 Part 1: Sandy and the Jersey Shore

Episode number: 1

Overview: For the first time, This Old House takes on three homes at the same time. The team meets the homeowners and discusses rebuilding stronger, smarter, and safer.

Jersey Shore Rebuilds 2013 Part 2: Drastic Measures

Jersey Shore Rebuilds 2013 Part 2: Drastic Measures

Episode number: 2

Overview: The team discusses how FEMA impacts building requirements, and foundation options. The Manasquan home is razed. Kevin takes a tour of Bay Head. Trouble begins at Point Pleasant.

Jersey Shore Rebuilds 2013 Part 3: Getting to Work

Jersey Shore Rebuilds 2013 Part 3: Getting to Work

Episode number: 3

Overview: The Mantoloking home is examined from a new angle while the Bay Head house begins framing. The team learns about a innovative foundation to be used on the Point Pleasant home. And the shows visits a business in Bay Head that has already successfully rebuilt.

Jersey Shore Rebuilds 2013 Part 4: Built for Speed

Jersey Shore Rebuilds 2013 Part 4: Built for Speed

Episode number: 4

Overview: The show visits the boardwalk at Seaside Heights to view reconstruction. The Bay Head home has a new deck installed. The Point Pleasant project gets crushed! A visit to the factory that will make the Manasquan house in only one week.

Jersey Shore Rebuilds 2013 Part 5: Lines in the Sand

Jersey Shore Rebuilds 2013 Part 5: Lines in the Sand

Episode number: 5

Overview: The windows are installed at the Bay Head house. At Point Pleasant a new dinning room is installed in place of the garage. And the modular home arrives on site in Manasquan.

Jersey Shore Rebuilds 2013 Part 6: Go With the Flow

Jersey Shore Rebuilds 2013 Part 6: Go With the Flow

Episode number: 6

Overview: Breakaway walls and flood vents are installed at the Point Pleasant. The work on the modular home continues. What plants and trees survived Sandy?

Jersey Shore Rebuilds 2013 Part 7: Stories From Sea Level

Jersey Shore Rebuilds 2013 Part 7: Stories From Sea Level

Episode number: 7

Overview: Footings are added in Bay Head home. Point Pleasant gets stone veneer, fiber-cement siding and composite decking. Manasquan project is finished. Pro surfer Sam Hammer visits the show. And marine biologist Chris Wojcik talks about the bay.

Jersey Shore Rebuilds 2013 Part 8: One Year Later

Jersey Shore Rebuilds 2013 Part 8: One Year Later

Episode number: 8

Overview: A tour of the Mantoloking project. And the wrap party for the Jersey Shore projects.

Arlington 2014: Part 1: A New Project

Arlington 2014: Part 1: A New Project

Episode number: 9

Overview: The crew begins work on Italianate-style home originally dating to 1872.

Arlington 2014: Part 2: Old House Discoveries

Arlington 2014: Part 2: Old House Discoveries

Episode number: 10

Overview: Richard visits a water tank that has been disguised as a Greek temple. During demolition, the crew finds traces of the past. Roger moves a rhododendron .

Arlington 2014: Part 3: Concrete Jungle

Arlington 2014: Part 3: Concrete Jungle

Episode number: 11

Overview: Kevin, Norm, Tom, and mason Mark McCullough replace the substandard foundation by pouring a new slab and curb, all while preserving the antique fieldstone foundation. The crew also finds headroom and original plaster details in the living room.

Arlington 2014: Part 4: Quest for a Dry Basement

Arlington 2014: Part 4: Quest for a Dry Basement

Episode number: 12

Overview: Tom joins the home's new roof to the existing. Architect David The architect explains how much change an 200 additional square feet the house. The existing fieldstone foundation gets additional repairs and waterproofing. Roger tours a nearby Garden. Norm and Tom repair the front door.

Arlington 2014: Part 5: Getting to Level

Arlington 2014: Part 5: Getting to Level

Episode number: 13

Overview: Leveling the ceiling in the kitchen and the floor in the finished basement is explained. An opening for a new window is cut. Landscape architect Cricket Beauregard explains what to do with a shady front yard.

Arlington 2014: Part 6: Additional Details

Arlington 2014: Part 6: Additional Details

Episode number: 14

Overview: The new kitchen windows are inspected. Cast iron waste pipes are installed with a traditional lead and oakum joint. Outside -- trim is replicated and new siding is installed.

Arlington 2014: Part 7: Arlington Heights

Arlington 2014: Part 7: Arlington Heights

Episode number: 15

Overview: Selective tree pruning occurs in the yard. Inside, Richard explains the choice between PEX and copper for water supply lines. Kevin tours an 1872 Stick Style home.

Arlington 2014: Part 8: Italianate Inspiration

Arlington 2014: Part 8: Italianate Inspiration

Episode number: 16

Overview: Exterior colors are proposed. A tour of a nearby 1870 Italianate style home. Richard shows a more attractive approach to PVC vents. Tom shows his favorite applications for radiant heat.

Arlington 2014: Part 9: Deadliest Old House?

Arlington 2014: Part 9: Deadliest Old House?

Episode number: 17

Overview: A "Deadliest Catch" star drops by to help with plaster cracks. Making the second floor railing safer.

Arlington 2014: Part 10: Old World New World

Arlington 2014: Part 10: Old World New World

Episode number: 18

Overview: Installing steps with ice. More plaster repairs. The use of 3D-printing for home repair. Review of the front porch design.

Arlington 2014: Part 11: House vs. Nature

Arlington 2014: Part 11: House vs. Nature

Episode number: 19

Overview: A hydrangea that is damaging the foundation is removed. Painting with red paint. How to keep the basement dry.

Arlington 2014: Part 12: Water Water Everywhere

Arlington 2014: Part 12: Water Water Everywhere

Episode number: 20

Overview: A visit to Spy Pond in Massachusetts. A new water main is installed. Chestnut flooring is selected. Fiberglass gutters that appear appropriate to the historical period are installed.

Arlington 2014: Part 13: Brick, Trim and Tile

Arlington 2014: Part 13: Brick, Trim and Tile

Episode number: 21

Overview: A sidewalk is prepared. Custom moldings are installed. Tiles are picked by the homeowner. New doors and countertops are installed.

Arlington 2014: Part 14: Soapstone, Marble, Oval Picture Frame

Arlington 2014: Part 14: Soapstone, Marble, Oval Picture Frame

Episode number: 22

Overview: Adding the final edge detail to soapstone countertops; cutting down 12-inch marble tiles for wainscoting; oval mirror frame; oak stair treads; darkening soapstone countertops with carnauba wax and walnut oil.

Arlington 2014: Part 15: Made in the Shade

Arlington 2014: Part 15: Made in the Shade

Episode number: 23

Overview: Installing a custom PVC fence and arbor; creating a marble herringbone pattern in the powder room; grout options for the faux slate floor in the mudroom; building a sliding barn door; alternatives to the usual shade plants.

Arlington 2014: Part 16: Decorative Details

Arlington 2014: Part 16: Decorative Details

Episode number: 24

Overview: A teak island top is installed in the kitchen; a vanity top is added to the master bath; an electronics nook is built; the pebble tiles on the shower floor are grouted; handmade wallpaper is hung; and a new front door is installed.

Arlington 2014: Part 17: Sod, Garbage Disposers, Crown Molding

Arlington 2014: Part 17: Sod, Garbage Disposers, Crown Molding

Episode number: 25

Overview: A truckload of fresh sod is rolled out; a replica ceiling medallion made with a 3D printer and a custom copper vent hood are installed; a garbage disposer is selected; a pedestal sink is installed in the powder room; and storage space in the master closet is maximized. Also: a lesson in crown molding.

Arlington 2014: Part 18: Italianate Renaissance

Arlington 2014: Part 18: Italianate Renaissance

Episode number: 26